You will see a gap on the long side joints when the plank is rotated down.
Installing laminate flooring on concrete floor.
Next use a back saw to cut the wooden door jamb by holding it perfectly level.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
To determine the roughness of the concrete floor we put a direct rail to the floor and a level is determined at any not very smooth place.
After removing the existing flooring baseboards and quarter moulding check that the subfloor is solid flat and clean.
How to lay laminate flooring on concrete.
To prepare the foundation concrete floor for laying laminate you will need.
For the next plank join the short end of the plank first image 2.
Place a piece of underlay on the concrete sub floor and a laminate board on top.
When installing a floating laminate floor you don t need to use any adhesive nails or staples.
Determine how much flooring and materials will be needed.
Remove any carpet or other flooring.
A container for solution.
This will help to acclimate the flooring to the room temperatures and humidity.
A plastic roller with spikes.
Work with great care otherwise you might scratch the jambs.
Add about 10 to that number to account for any possible mistakes and warped boards.
Install a plastic vapor barrier.
If your concrete passes the moisture test then plastic sheeting at least 6 mils thick will prevent moisture from getting into your laminate flooring.
Fix concrete subfloors with a patching compound and for wood subfloors remove protruding nails and replace any damaged boards.
Slide the first two rows into their final position and repeat steps 5 and 6 above using the same alternating plank technique to complete the process.
Leave the flooring in the room for three days before installation.
Where plastic sheets must be joined overlap the sheets by several inches and use strong vinyl tape to secure them.
Place the laminate flooring on the concrete slab in the room where it is to be installed.
Insert the tongue of the second row plank into the groove of the first row plank at a slight angle until the laminate edges meet.