The flooring will be able to expand and contract beneath the toekick without revealing a gap.
Install base cabinets over tile floor.
Shim beneath the cabinet to align it with the top of cabinet line you drew on the wall.
Leave a space between the cabinet and wall as recommended by the cabinet manufacturer.
Screw a strip of the same thickness to the floor next to the wall.
If there is movement in the flooring the nylon glides will allow it to do so quite freely.
Finally install the cabinets on both strips and attach the toekicks.
When determing how to install base cabinets on uneven floors check for level and plumb and add shims until the cabinets are at the same level.
2 lift and turn the island cabinets on their sides to.
If the tile assembly is installed after the cabinetry perimeter joints must be placed where the tile meets the cabinets.
It s usually wise to install kitchen flooring before the base cabinets.
There are a couple quality items to consider when installing the cabinets before flooring.
Drive 3 inch screws through the wood and into the tile to anchor the wood frame to the floor.
Shim up base cabinets keeping in mind the underlayment and flooring thickness the base cabinets should be raised up to accommodate the thickness after installation of the floor.
Mark the perimeter or outline of the base of the island on the tile floor with painter s tape.
When the cabinets are.
One trick i use is to install nylon chair glides on the underside of the base cabinets.
Otherwise the cabinet toe kicks and countertop will be short.
The cabinets won t be going anywhere after everything is assembled and the counter will help unitize everything as well.
Consider installing thin floorings such as luxury vinyl laminate or tile which are possible to lay right up to the cabinets.
8 set the cabinets on the wooden frame and align flush with the framing lumber.
The cuts to the toe kicks and sides of the cabinets must be very neatly cut sanded and filled with rounded backup foam backer rod and a flexible sealant such as 100 silicone or have finish trim applied to cover the clean and open perimeter joints.
Is your home protected against unexpected repair needs.
Now install the new flooring but keep it about a inch from the first filler strip.
The ragged edge of the flooring is then covered over with quarter round or base molding.
For one thing working in this sequence means you don t have to modify the floor material to achieve a seamless look.